Recent installation, replacing redundant pumping equipment with new energy-efficient inverter drive version.

Heat Exchanger

Two week project including the design and installation of two hot water calorifiers and replace with new plate heat exchangers i.e. Cetemodule exchanger units able to cater for abnormal/intermittent peak demands.

Benefits: Upgrade of existing equipment to new more energy efficient units but able to accommodate peak demands.

75 KW River Feature Pump

Unit removed from site, refurbished within our workshops, re-installed and inverter drive re-commissioned.

Benefits: Energy Saving

Bespoke Build Chiller Unit

This unit was specially designed to suit a roof top chiller unit in the centre London.

Benefits: Energy Saving

Sewage Station Repairs

Outline of works carried out. Engineers attended site during Christmas shut down. Sewage pumping station foot stalls and associated pipe work were replaced.

Benefits: Increased the efficiency of the pumping station

Bio-drum service and over haul – National Trust

Engineers carry out monthly service on all mechanical operations and take water samples to check water quality.

Share on
If you would like to know more about the solutions Metcor provides, please get in touch with us today.
 
Please call our national 24/7 customer service desk for all urgent enquiries.
 
Get in touch with us via email and one of our team will come back to you shortly.